Powered By Blogger

Friday 21 November 2014

[Environment] canal progress

the walk ways for the canal have been expanded and now pylons have been added in. The canal barge has been added in for scale and to check if the canal is wide enough and the bridges tall enough for it to pass through.

Wire frame of the canal


Canal without the wire frame to show normal's.


Canal with blocked out buildings for now just to show placement. 


No comments:

Post a Comment